The Production Part Approval Process (PPAP) is a standardized process in the automotive industry that helps to ensure that suppliers provide quality parts that meet
IMDS Recommendation 025 – Evaluate the product’s recycled and bio-based content. It is an updated recommendation released in IMDS Release 14.0 that provides guidance on
Harmful chemicals can travel around the globe and cause adverse effects far from where they were produced and used. Persistent organic pollutants (POPs) are well-known
The Part Submission Warrant is a crucial document in the PPAP process that accompanies the submission of an original or revised part for production. This
Automotive Electronic Council qualification (AEC-Q) standard, which is derived by AEC component technical committee to electrical components and their qualification requirement. AEC-Q is US based
Initial Process Studies used for to measure the consistency of the process or product performance based on specified design by reaching consistency of the product
Understanding the needs, requirements and expectations of the customer is what Advanced Products Quality Planning (APQP) is all about. APQP helps in mitigating the risk
Every organization has to face a lot of challenges in PPAP approval process to fulfill requirements of the entire supply chain. A proper mechanism to
Changes Release IMDS 13.0 On 19th May 2021, the IMDS Steering Committee has released the most recent version of IMDS – 13.0, which has brought
What is Protection of CBI (Confidential Business Information)? The protection of CBI is a process that allows certain information, such as the chemical identity of